Doubel Combustion Chamber

All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.

Read More

High Temperature Incineration

Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.

Read More

Get Lastest News

There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation

Read More

Nanjing Clover Medical Technology Co.,Ltd.

Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201

Latest Product

Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.

Latest Post

the three incinerators for burning and incineration of drugs and toxic substances

Requirements and specifications for the process of supply, installation, operation and guarantee the three incinerators for burning and incineration of drugs and toxic substances for customs department

Free three years guarantee for incinerators from delivery date. In addition of free spare parts guarantee letter should be valid for 10 years from the end date of guarantee.
Electric unit should be delivered with service manual in English
Electric capacity should be 380-220 v 60 Hz for all equipment
Delivered time as soon as possible
Validity of offer should be not less than 6 months
In case of order, we need two certificates of origin that should be stamped from Saudi embassy in your country
Commercial invoice (certified from Chamber of Commerce)
Two original bills
Send someone to fix and train our staff for 5 people in each location
Send your manuals for installation units
Waiting for your good reply
Please provide details for the following,
1-Technical explanation includes technical specifications, scope of work, the requirements of the operation and maintenance.
2- Technical explanation for technicians training and furnace operators
3- Catalogs of oven with all the required specifications

The offer price must include the following;-
1. Training for technicians and operators for a period not less than two days at each site and give trainees training certificates
Documents must contain all the information such as brochures, technical resources, operating, maintenance manuals, and brochures dealing with the keyboard
2- Letter from the manufacturer to give three years guarantee for incinerators from delivery date. In addition of free spare parts guarantee letter should be valid for 10 years from the end date of guarantee
3- Provide certificate that the incinerators are environmentally friendly and attach proof that environmental protection organizations in the country of Origin and your product should be emissions free due to the sensitivity of its international air ports.
4-copmany must committed delivery, operation, and installation within 60 days from the date of site projects detection
5- Train five people for two days for each device for a period of two days for installation, operation, and safety. Give them certificates
GARANTEE
Provides operating and emergency maintenance also provides free spare parts for three from the starting date of the project. The company must make regular maintenance every 3 months and raise the maintenance report to the management of public concern and Maintenance.
The company must make all the maintenance work as well adjustment of the control and protection devices and filters / filters purify insulation
Specifications of ovens:
•    Installing a readymade concrete base (Precast) with Height 30 cm above the ground and 20 cm below the surface of the earth.
•    The dimensions of the base are increased by (2 meters) from the edge of incinerators
•    The rest of the accessories in all the trends even allows the worker directly feeding and maintenance work, cleaning and move easily taking into account the tendencies of the base toward the door for drainage of water.
•    The floor coating must be high-quality epoxy paint.
•    Install anti-rust and heat Umbrella of brick and steel (pyramid shape) of (5) meters height above the ground which installed with the edge of the concrete base by thick galvanized columns
•    This umbrella Cover the site furnace and allow bringing the chimney
•   The site is surrounded by an iron fence (sheet metal) 3 meters height from the surface of the earth in order to protect the incinerators from dust storms
•    The iron fence must have a 5 meters Width gate
•    Automatic anti-rust and heat electrical circuit must be provided
•    The furnaces are highly efficient, emissions-free, safe, and environmentally friendly and have capacity of not less than 3,000 kg of materials and the rate of burning at least 400 kg / h
•    The method of feeding the furnace through a side slot or from the top and the emission of the smoke is completely prevented.
•    a furnace Must have two rooms, one of them is the  main room of not less than the “5” stoves to the process of burning materials and other secondary room of not less “2” stoves to burn resulting gas from the first process as well as the chimney
•    The main component of the body of the furnace is stainless steel box, the thickness of not less than 7 mm with a layer of zinc phosphate plated with aluminium reflector to heat
•     the thickness of the door of 150 mm and a hardness of not less than 170 kg / m 3 to be burnt, automatic comprehensive remote system.
•    Furnaces must be destructive enough to burn and incinerate the material which mentioned previously
•   furnaces must have certificates are supported global enterprises and government competent for environmental protection In the country of origin or the General Presidency of Meteorology and Environment Protection in Saudi Arabia
•    The oven can work for 24 hours so as to allow for the burning of materials for a period of not less than 12 consecutive hours and the remainder for cooling and provides full fuel tank with a capacity of 1000 L to turn on the oven.
•    Must have an automatic ignition and diesel is used
•    a furnace has the ability to withstand extreme temperatures up to “130o c And also, it guarantees continuous operation of which can be utilized for 24 hours with the ability to remove residues during the work of the oven, Insulating layer of calcium must be present in the rooms with Thickness not less than 50 mm and a wall thickness of 100 mm
•    Isolation of burning room: the space between the walls must be of the “stainless steel”. In addition, burn room must fill with Thermal insulation material.
•    Ensure that the combustion of materials emitted in the secondary room should be at least two seconds period and the room is lined with high-density ceramic fibbers
•    Incinerators must contain a system for processing (purification) gasses before emission of the smoke.
•     Incinerators must have the capacity of self-cooling after the end of the daily operating period.
•    Incinerators must have chimney not less than “4 meters” height from the surface of the oven, also, it must be thermally insulated and non-rust able, and must also be removable, installation and tide default.
•    Electrical capacity required “220/ 380-volt “60 hertz
•    Incinerators must be fitted with a control panel of the electronic keys to monitor all the necessary indicators of activation keys, as well as start-up and switch off so as to be isolated inside a metal box with the presence of the following:
Alarm Sensor in the event of (crashes “burner” or purification device or heat leakage       or internal connections and wiring)
Monitors for the temperature of the rooms
Aerosols Filter indicators/ monitors
Room temperature sensors
Indicators for furnaces and index overload
Timer for Extinguish the oven automatically depending on the time required.
•    All equipment must be highly resistant to external conditions such as high temperature (50oc)
•    All doors must have special lock are not allowed non-persons appointed to work.
•    Providing fire extinguisher for each site with a capacity of 10 kg at least

cytotoxic waste

Our interest is for disposing mainly cytotoxic waste, namely out of date or out of specifications cytotoxic pharmaceuticals. Other wastes for which we’d like to dispose along with the cytotoxic waste consists of out of date or out of specifications psychotropic pharmaceuticals (but not necessarily narcotics), sharps (needles) etc.

It is also very important for us to know if the unit is eligible to treat cytotoxic waste and also the characteristics and disposal of treatment residues. Moreover, operational needs in terms of energy and fuel consumption, as well as especially the off-gas treatment system applied, bear significant importance, as meeting the demands of Regulation 2010/75/EC is naturally necessary.

The quantity of disposal is about 100 kg per day as minimum. Bigger capacities up to 500-600 kg/d are also of great interest to us. Thus, please send us your proposal for both aforementioned daily capacities.

small scale incinerator

an industrial sized incinerator for tobacco and tobacco waste

inciner8ter model TS50 OR TS100 With  delevery in Europe stare Croatia.Please can you send me the offer for pet crematory equipment.details of Chemical waste incinerator.
For animals to 90 kg. cremation equipment for pets ( Max. Size dogs till 80 kg )1. technical specification is for burner only
2what is the capacity of burner in one hour?
3.  35 for burners, 8 for control case, 1 for HD is that the weight of each item?
4. are these already configured so that the  assembling  becomes easy between control case and burners with HD?oil burner, 2sets (bigger capacity)
Temperature Thermocouple,   2 sets
Oil Tank 100Liters, 1 set
Thermal Gasket, 10 Meters
Incinerator control Case, 1 set
Blower,    1 set.an industrial sized incinerator for tobacco and tobacco waste. Details

Brand = Any

Model = Any

400v/50hz

·        Types of waste – woods, tree branches, tree leaves, wood powder and card boards

·        Daily Hours of operation  = 7 hours

·        Per day produce waste capacity = 10000kg
THEE SETS OF CATALOGUE ORIGINAL SHOULD BE RECIVED BY DHL + CD  VEDIO
THREE  YEARS GUARANTEE FREE FREOM DELIVARY DATE  AND FREE SPAR PART ALSO,   GARANTEE LATTER SPAR PART  SHOULD BE VALID FOR 10 YEARS FROM THE DATE OF DELIVEARY .
ELECTRIC UNIT SHOULD BE DELIVERD WITH SERVIC MANUAL IN ENGLISH FOR EACH ONE
ELECTRIC SHOULD BE 380-220 V HZ 60 FOR ALL EQUIPMENTS
DELIVER TIME ASB
OFFER VALIDITY SHOULD BE   6 MONTHS
IN CASE OF ORDER I NEED
TWO SETS OF CERTIFICATE OF ORGINE SHOULD BE STAMPED IT FROM SAUDIA EMBASSY IN  YOUR COUNTRY
COMMERCAL INVOICE( LEGALIZED FRO CHAMPER OF COMMERCE)
TWO ORGINAL  BILL OF LADIN
should BE SEND  SOME ONE FOR FIXE AND  TRANING    FOR 5 PERSON IN EACH LOCATION
SHOULD BE SEND YOUR DIZIN  FOR  INSTALATION  UNITS
AWITING YOUR  GOOD REPLY

Supply, Installation and commissioning of Waste Incineration system

De manera atenta solicito me colabore con la cotizacion del incinerador incluyendo envió.Puri group a hospitality business in Indonesia is interested to introduce renewable energy in Indonesia or to use the energy sources for its facility around Indonesia. Kindly request to have more information on incinerator technology as it is needed to process 100 ton to 500 ton waste aday. In the Frame of our Specialized Projects Management, we are currently in search for supplier of Waste Incineration system for hazardous waste, the incineration system will be used for incineration of Prohibited Drugs and toxic materials, waste poultry, Dead Animals “cows, goats”, Spoiled vegetables, Etc. at customs Ports. For that we would like to request for your technical and Financial Proposal for supply , installation and Commissioning of Hazardous Waste Incineration system with incineration capacity of at least 400 Kg/ hr.

Page | 3

The proposal should include the complete description of the whole system: Total cost of supply, Installation, commissioning, Automatic feeding, automatic de- ashing during operation, and efficient gas cleaning system (wet, dry or high temperature ceramic filters), continuous emission monitoring system (CEMS), and all    other    accessories, Control    panel    for    all     components     of     the system, Troubleshooting alarm system covering all components of the system, to notify the operator for the fault that may arise during the operation, and to perform immediate corrective action, Emergency Stop button that can easily shut off / shut down all major part of the system in case of emergency situation. Primary chamber capacity/ Average capacity per patch Load: 3000 Kg, Incineration capacity per hour 400 Kg/hr., Loading system: side loading, Number of burners: minimum 7 burners, (5 for primary chamber, 2 for secondary chamber), Fuel: Diesel, The system should work continuously for at least 12 hours per day, The primary chamber: Heavy- duty anodized Rust resistant steel casing with minimum thickness 7mm. painted with heat reflective paint, internal heavy duty refractory cement lining and insulation for maximum heat retention. Cost of supply, installation, operation cost including fuel consumption per hour, and cost of other consumable materials treatment materials (consumption rate per hour and unit cost each), delivery time till operation, Layout for the whole three units and gas cleaning systems, considering minimum are required for the system “including enough area for operation and handling”, Confirmation letter that gas emission from the system after gas cleaning should comply with Saudi regulations for gas emissions (stamped letter and Emission comparison table showing the emissions from your system compared with Saudi regulations “attached”)

Page | 4

•    Incinerator should have two (2) chambers: primary chamber with five (5) burners to incinerate materials and the secondary chamber with two (2) burners to incinerate exhaust gases.
•    The main body of the incinerator shall be stainless steel and the outside insulation thickness of not less than 7 mm made from zinc or phosphate for temperature insulation
•    The main gate of the Incinerator should be 150 mm thick and strength not less than 170 kg/m3. The door should be automatic with remote to operate.
•    The Incinerator should be designed in accordance of the environmental regulation followed in country of  origin or  as per  Saudi Arabian PME Regulations.
•    The incinerator should have fuel storage with capacity of 1000 liter.
•    The incinerator shall have the capacity to operate with temperature up to 1300 OC in the primary chamber and it can remove the residual while the incinerator is in operation
•    The inside body of the incinerator should have insulation layer made of calcium with thickness of 50 mm while the thickness of the internal surface should be 100 mm in order to stand with 1300 OC.
•    All the supporting braces of the incinerator shall be installed on stainless steel.
•    The gap between the internal and external body shall be filled with the special insulation material.
•    The exhaust shall not stay more than two (2) seconds in the secondary chamber and this chamber shall be built with high density of ceramic oasis.
•    There should be a stack with four (4) meter from the top surface of the incinerator and can be removed and installed.
•    The incinerator shall have control device for exhaust gases so that the emission shall meet the PME source standards
•    The power supply should be 220 – 380 Volts, 60 Hz. and the incinerator shall be provided with control panel showing the following:

Page | 5

•    Temperature of primary and secondary chamber.
•    Condition of pressure gages.
•    Alarm showing if there is any leakage or misconducting in the electricity.
•    Indicator for overloading the burner.
•    Timer for automatically switching off the incinerator.
•    All the incinerator parts including fuel pumps, fans, valves and pipes can be operated in high ambient temperature (50OC)
•    All  parts  of  the  incinerator  shall  be  painted  in  one  color  which  should  be resistant to high humidity, high temperature and high dust / sandstorm.
•    3 years warranty with spare parts and technical supply and
•    10 years warranty for  providing spare  parts starting from the  date  of first warranty expiry
•    Provide all the list of consumable items like, filters, sorbents, etc.

The bidder shall provide all necessary details related to the facility dimensions, space area required for the whole system and all operation requirements, Details about required facility (hanger) including Layout, civil work and electromechanical details including electricity, water pipes, fuel pipes, tanks, etc. Complete Drawing & 3D drawing Clearly Show All Sections and Details of the System. List of spare parts and checklist. Required Operation staff, Fuel consumption rate of the whole system. Since our project is a turnkey project including Design, Build & Operate of central incineration facility covering all the above mentioned details and we have to coordinate all civil works and necessary requirements to operate the system.

A PYROLYTIC MEDICAL WASTE INCINERATOR FOR LARGE SCALE

SPECIFICATIONS OF A PYROLYTIC MEDICAL WASTE INCINERATOR FOR LARGE SCALE
1.    Capacity of destruction in weight: 500 kg/h.
2.    It should be able to operate not less than 8 hours/day
3.    This incinerator must be able to destruct all combustible wastes produced by hospitals, private clinics, laboratories, institutes, etc…
4.    Design Specification : Types A, B, C, D, and E of medical waste
5.    “PYROLYTIC” combustion, by controlling the gasification of waste.
6.    The incinerator must avoid the release of black smoke and fine dust, (Smokeless) during the loadings.
7.    It should be able to reduce the volume of wastes by 98%.
8.    It should be able to hold emission in the second burn with gas residence of not less than 2
seconds.
9.    The incineration should be completely free from visible smoke as well as offensive odours.
10.    The lower calorific power (L.C.P) of this waste will be 3,500 kcal/kg
•    The Temperatures of combustion: Minimum will be 850oC and max 1400oC
•    Post combustion: >1100oC.
11.    The Internal diameter of the Chimney: Ø 400 and its height: 8 m
12.    The Volume of the combustion chamber: 1.200 L
13.    The Dimension of the door for loading in cm: 120×120.
14.    Burner operation should be Automatic On/Off
15.    Fuel : diesel/Gas
16.    The supplier must provide necessary information for the best of the installation This incinerator with “PYROLYTIC” combustion must have:
17.    A combustion chamber of waste:
*    Perfectly tight door for the manual loading of waste. The loading should be Manual, Batch
Load
*    A burner of lighting which the use is limited to the ignition of waste.
*    Frontage of loading with door seals gone up on hinges, wheel of screw plug, flexible joint, and stuffing insulating out of refractory.
*    The insulation of the combustion chamber should be composed of refractory bricks, having a high content of aluminium and insulates bricks in order to assure a minimum temperature on
the outside sheet metal.
*    Composition of the refractory;
•    Refractory concrete :
▪    . Thickness    : ≥100 mm
▪    . Nature: 42% of Al203
•    Insulate in fibrous panels :

▪    . Thickness: ≥75 mm
•    Nature: Calcium silicate.
*    Burner of lighting of waste, with fuel, standard mono-bloc casting guiding plunging flame, lighting and safety of electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.
*    Plate of combustion in Carborundum, avoiding the fixing of glass and slags.

18.    A chamber of post combustion of gases
*    A burner of combustion of gases,
*    A device of injection of air allowing a total recombustion of gases,
*    A device of air inlet of cooling of waste gases,
*    A sheath of evacuation of the gases burnt.
*    Carcass in strong sheet steel with support of connection.
*    Composition of the refractory;
•    Refractory concrete :
▪    Thickness    : ≥150 mm
▪    Nature: 65% of Al203
•    Insulate in fibrous panel :
▪    Thickness: ≥85 mm
▪    Nature: Calcium
*    Burner with fuel, mono-bloc casting guiding type with horizontal flame, lighting and safety of electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.
*    A secondary injection of air to ensure perfect oxygen content.
19.    A control box ensuring the complete cycle of combustion.
20.    A Pollution control device connected to the flue chimney must be connected to prevent
unnecessary escape of pollutants

21.    Fan:
*    Electro-ventilator distributing the secondary air, the regulation of the air flow being carried out by valves and following the control of the automatic cycle.
22.    Controls and regulations:
Control box watertight to dust, including:

*    A switch circuit breaker for each engine (ventilators and burners).
*    A timer with adjustable temporization for the regulation of each burner.
*    A regulator with digital watching for the temperature of combustion.
*    A regulator with digital watching for the temperature of post combustion.
*    Electric box.

21.    The de- ashing must be done in the bottom of the combustion chamber or the deashing should be Automatic or manual batch de ashing.
22.    Process Filtering system : Scruber to be mentionned as optional
23.    Emission Standards Compliance: BS 3316 or équivalent standard
23.    Capacity to treat Plastic: Not less than 40% by weight
24.    CE Manufacturing Compliance: BS EN 746-2-1997

23.    The supplier must give batches of spare parts of first urgency and consumable of the incinerator.
24.    The installed incinerator must bear a one year guarantee.
25.    The supplier shall perform an onsite installation of the incinerator.
25. The technical training of operators will have to be provided and given by a technician from the factory; it will consist of curative and preventive maintenance, and the use of machine, etc

NB.: Civil works and any other related services for the installation and training of operators must be included in the incinerator’s price.

Clover's Social Media