Doubel Combustion Chamber

All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.

Read More

High Temperature Incineration

Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.

Read More

Get Lastest News

There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation

Read More

Nanjing Clover Medical Technology Co.,Ltd.

Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201

Latest Product

Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.

Latest Post

Various Types of Incinerators

hazardous waste high temperature incinerators for the treatment of hazardous wastes. The waste will be mixed, including medical, oily wastes, woods and laboratory wastes. Primary combustion
Diesel/LPG/LNG burning primary combustion chamber/primary combustion zone
Secondary combustion
Residence time in the secondary chamber not less than 2 seconds
Both primary and the secondary temperatures maintained until all the waste has been completely combusted
Chimney
Chimney with a minimum height of 4 meters above ground level
Minimum exit velocity of the emissions not less than 10 metres/second
Temperature Warnings
Audible and/or visible alarm to warn the operator when the secondary temperature drops to below the required temperature
General
Control box that can be detached and mounted on separate stand at least 1.5 meters from incinerator at approximately 1.6 meter height

Incinerator model A
Burn Rate 65kg/h minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time – 2 Seconds
Fuel – Diesel/LPG/LNG, please indicate
Power Supply for Control Box – 220V-240V 50Hz single phase
Minimum operating temperature 850 °C, please indicate
One year Spare Parts Package for complete maintainability
10m Hose Pipe, indicate length
I000 Litre Fuel Tank + Pipe System, indicate volume
Additional chimney extension, indicate height
Warranty, indicate no of years

Incinerator model B
Burn Rate 150kg/h minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time – 2 Seconds
Diesel/LPG/LNG, please indicate
Power Supply for Control Box- 220V-240V 50Hz single phase
Minimum operating temperature 920 °C, please indicate
One year Spare Parts Package for complete maintainability
10m Hose Pipe, indicate length
I000 Litre Fuel Tank + Pipe System, indicate volume
Additional chimney extension, indicate height
Warranty, indicate no of years

Incinerator model C
Burn Rate 250kg/h minimum
Weight (kg) please indicate:
Secondary Chamber
Gas Retention Time 2 Seconds
Fuel Diesel/LPG/LNG, please indicate
Power Supply for Control Box 220V-240V 50Hz single phase
Minimum operating temperature 920 °C, please indicate
One year Spare Parts Package for complete maintainability
10m Hose Pipe, indicate length
I000 Litre Fuel Tank + Pipe System, indicate volume
Additional chimney extension, indicate height
Warranty, indicate no of years

Lot 4 – High Temperature Waste Incinerator
HTW Incinerator model D
Burn Rate – 150kg/hour minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time 2 Seconds
Fuel Diesel/LPG/LNG, please indicate
Power Supply for Control Box 220V-240V, single phase 50-60Hz
Minimum operating temperature 1200°C, please indicate
One year Spare Parts Package for complete maintainability
10m Hose Pipe, indicate length
1000 Litre Fuel Tank + Pipe System, indicate volume
Additional chimney extension, indicate height
Warranty, indicate no of years

Lot 5 – Mobile Incinerator
Mobile Incinerator model E
Burn Rate 50kg/h minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time – 2 Seconds
Fuel – Diesel/LPG/LNG, please indicate
Power Supply for Control Box – 220V-240V 50Hz single phase
Minimum operating temperature 850 °C, please indicate
One year Spare Parts Package for complete maintainability
10m Hose Pipe, indicate length
1000 Litre Fuel Tank + Pipe System, indicate volume
Additional chimney extension, indicate height
Warranty, indicate no of years

Lot 6 – Mobile Incinerator
Mobile Incinerator model F
Burn Rate 100kg/h minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time – 2 Seconds
Fuel – Diesel/LPG/LNG, please indicate
Power Supply for Control Box – 220V-240V 50Hz single phase
Minimum operating temperature 850 °C, please indicate
One year Spare Parts Package for complete maintainability
10m Hose Pipe, indicate length
1000 Litre Fuel Tank + Pipe System, indicate volume
Additional chimney extension, indicate height
Warranty, indicate no of years

Lot 7 – High Temperature Waste Mobile Incinerator
HTW Mobile Incinerator model G
Burn Rate 100kg/h minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time – 2 Seconds
Fuel – Diesel/LPG/LNG, please indicate
Power Supply for Control Box – 220V-240V 50Hz single phase
Minimum operating temperature 1200 °C, please indicate
One year Spare Parts Package for complete maintainability
10m Hose Pipe, indicate length
1000 Litre Fuel Tank + Pipe System, indicate volume
Additional chimney extension, indicate height

durable and highly efficient incinerators with various capacities for hospital/medical waste, cremation and other solid waste treatments

Single and Dual Chamber Medical Incinerator.durable and highly efficient incinerators with various capacities for hospital/medical waste, cremation and other solid waste treatments.

 

Chamber Double

Burning Rate      10 kg per hour (for two incinerators)

Burning Rate     20 kg per hour (for three incinerators)

Loading   Method   Manual

No of Burners   Single for 10 kg/hour and Double for 20 kg per hour

Fuel                    Diesel and Natural Gas

Warm Up Time    Not more than 20 minutes

Temperature controller   Digital

Power Supply      Single Phase 220V

Chimney Height    20 feet from ground level

·         50kg per hour

·         Option for  medical waste.

Type
Single Chambered Cylindrical

Feed Material
Papers, Cartons wastes

Capacity
1000 Kg/Day

Burning Capacity
125 Kg/hr

Design Standards
Generally confirming to IS Standards

Type of burning operation
Zero Fuel System

Combustion Chamber

Type
Cylindrical

Dimension
1.25 m Dia (Approx) x 1.2 m Height (Approx)

Temperature
400 – 600 °C

MOC
Chrome Alloy Steel, inside lining with fire bricks/Ceramic Clay

Outer Lining
Thermal Proof Lining

STACK

Type
Self Supported

MOC
MS

Accessories
Port Hole and Ladder for emission testing with complete online scrubbing system, thermostat

The units will be used for our client camps in the field. These Camps range in manning size from 20 – 200 people. Each site has a medical clinic, a very small use for medical but will need it.

Medical Waste Incinerator of 20 kg/hr capacity with dual burner

3 Medical Waste Incinerator of 20 kg/hr capacity with dual burner.Medical Waste Incineration Systems. i’m interested to destroy about 200 kg remains. a Medical Incinerator project for Tehran municipality. Our purpose for this project is to establish a plant in order to incinerate Medical waste with 50 ton/day capacity. a incinerator with 100 kg / hour burning capacity. And it should work on diesel fuel, 2 chamber. Waste management
Incinerator
*External diameter at base 6ft 1.8m
*External diameter at top 4 1/2ft 1.35m
*Internal diameter at base 3ft 0.9m
*Internal diameter at top 3ft 0.9m
*Thickness of wall at base 18cm
*Thickness of wall at top 9cm
*Perpendicular height of wall 4ft
*Height of Iron bars from grate above ground 1ft

Material Required
*Puddle swish
*5 or 6 Iron bars about 4 1/2ft 1.35m long each
*Quantity of large stones for foundation
*2 empty kerosene tins for making vent holes
*2ltrs of coal tar
*2 brushes
*Foundation 1ft-1 1/2ft deep is dug
*Filled with large stones and puddle swish to ground level
*Empty kero tins are next placed into position where the vent holes are to appear
*Wall 1ft high is built with puddle swish
*Iron bars are put in position leaving a space of about 2cm-3cm between the bars 4ft 1.2m to be reached
*Wall plastered smooth.Incinération à haute température pour la destruction complète des déchets contaminés ou dangereux.
Principe de combustion pyrolytique avec brûlage des fumées dans une chambre de post-combustion
Incinérateur double chambre 900°C/1200°C de capacité 30 kg.
Equipé de : 1 brûleur de combustion + 1 brûleur de re-combustion + 1 laveur de fumées. Capacité de destruction horaire
En poids : au moins 30 kg
En volume : au moins 200 litres
Température :
Combustion : 900°C
Post combustion : 1200°C
Puissance des brûleurs
Combustion : au moins 80 KW
Post combustion : 80 KW
Puissance électrique : environ 2 KW
Cheminée :
Section : environ 30×30 cm
Hauteur (minimum) : au moins 8 m
Dimension de la porte de chargement : environ 50X50 cm

incinerator small to medium waste dispossal

Carburant Diesel
Capacité (M3) 1.92
Ave Capacity 1200kg
Consommation (litre/heure 12
Dimension externes
Longueur (mm) 3110
Largeur (mm) 2150
Hauteur (mm) 3200
Ouverture Porte 1000×2000
Dimension internes
Longueur (mm) 2200
Largeur (mm) 1050
Hauteur (mm) 800
Opération. incinerator small to medium waste dispossal for about 150-200 municipal waste from shopping mall, office and residential.

The waste most consist of vary materials plastics, rubber, paper, grass, leaves, woods, fruits, packaging carton, and many others

Minimum température d’opération 950
Maximum température d’opération 1320
Température de suivi oui
Thermostat oui
Ventilateur oui
Chambre de combustion secondaire 2 secs
garantie minimum 12 mois
Carburant Diesel
Capacité (M3) 1.18
Ave Capacity 750 kg
Consommation (l/h) 6
Dimension externes
Longueur (mm) 3110
Largeur (mm) 1800
Hauteur (mm) 3300
Ouverture Porte 770×2000
Dimension internes
Longueur (mm) 2100
Largeur (mm) 700
Hauteur (mm) 800
Opération. incinerator small to medium waste dispossal for about 150-200 municipal waste from shopping mall, office and residential.

The waste most consist of vary materials plastics, rubber, paper, grass, leaves, woods, fruits, packaging carton, and many others

Minimum température d’opération 950
Maximum température d’opération 1320
Température de suivi oui
Thermostat oui
Ventilateur oui
Chambre de combustion secondaire secs
garantie minimum 12 mois.a small animal crematorium, styles and prices

Sudan Medical waste Treatment Scheme

•    A burn rate of 25 – 30kg/hr.
•    Consists of two chambers to ensure significant reduction of emissions and be capable of temperatures in the range of 800-1000˚c.
•    Incinerator must be of a low maintenance design, be diesel fuelled and need no more than 15 amp 220-250 V power. KW consumption per hour should be stated.
(1)  What  are  main  differences  between  medical  incinerators:    YD-10C  and  TS10(PLC)?
(2)  After  combustion,  the  medical  waste  becomes  smoke?  Without  smell?  No  pollution?
(3)  What  should  we  do  to  release  the  smoke?    Prepare  a  pipe  to  direct  the  smoke  to  factory  outside?
(4)  Any  operation  guide  for  reference,  we  worry  that  it’s  difficult  to  operate?
•    The incinerator should also be able to run off a generator.
•    The incinerator should have option of tank and should use no more than 12L of diesel fuel per hour to burn 25- 30kg of waste.options for medical waste incineration for Kabul, Afghanistan
•    Design must be such to minimize risk to operators and have a simple start sequence to minimize operator training and skills
•    Solid waste reductions in the range of 90 – 97% should be routinely achieved.a central thermal treatment station in the city of Khartoum (9 million inhabitants) we started with two units of autoclave that treat up to 18 tons a day so far, and looking forward to add an incineration plant/s to serve for medical, pharmaceutical, and hazardous waste.

Clover's Social Media